Professional High Quality Stage Lighting Manufacturer
PRODUCTS
[custom_breadcrumb separator="»" home_text="Home"]
| Light Source | 9x18w RGBWA+UV LEDs |
| LED Life Expectancy | 50,000 hours |
| Beam Angle | 15°/25°/45°/60° |
| Protection Rate | IP65 |
| Product Dimension | 140x140x200mm |
| Net Weight | 4.95 kgs (10.9 lbs) |

The BP-918SIP utilizes die-cast aluminum technology, upgrading its LEDs from RGBW to RGBWA+UV, achieving a wider color gamut, richer color tuning, and smoother color transitions. The 9*18w RGBWA+UV LEDs offer full pixel control. Built-in DMX wireless technology, Wi-Fi app, and IR functionality simplify installation, eliminating the need for wiring and significantly reducing setup and dismantling time, making it particularly suitable for mobile performances and events with limited power.
Wider RGBWA+UV Color Gamut, More Natural Color Mixing
This par light uses RGBWA+UV LEDs, offering superior color mixing compared to traditional RGBW. It overcomes the coldness and harsh transitions often found when mixing RGB and pure white, allowing for precise control of warm gold, soft orange, and natural flesh/skin tones, resulting in unique fluorescent reactions and a “black light” stage visual effect.
Color temperature is more natural, and color transitions are smoother.
Full Pixel Control, Rich Macro Functions
This light features full pixel control for the LEDs and a rich set of macro function patterns, reducing the programming workload for lighting engineers.
Built-in DMX wireless, IR, and WIFI APP control
The lights feature self-propelled operation, voice control, wireless DMX control, IR control, and WIFI app control, greatly simplifying stage performances and eliminating the constraints of cumbersome signal and power cables.
These features significantly improve lighting efficiency, making light adjustments, color switching, and scene synchronization more intuitive, flexible, and convenient. Ideal for wedding parties, small band performances, and outdoor events.
Built-in Battery
The battery charging time is approximately 6-8 hours. It can run for 12 hours in single color and auto modes, and for 4 hours at full power, greatly facilitating performances.
Die-cast Aluminum Metal Structure
Utilizing a precision-machined die-cast aluminum shell, it offers excellent heat dissipation and can withstand harsh external environments, ensuring long-term reliability and stability.It enhances structural strength while optimizing heat dissipation; its durable metal shell ensures long-term reliability and stability in demanding professional environments.
Waterproof Protection
IP65 Protection rate, is suitable for indoor&outdoor stage light dj applications.
| Model Model Name: IP65 9X18 BATTERY POWERED PAR CAN
Light Source Light Source: 9X18W RGBWA+UV LEDs
Optical System Beam Angle: 15°/25°/45°/60°
Control 4 touch button control panel
Other Effects Outstanding strobe effect with variable speed | Electrical and Connectors Input Voltage Range: 90-260V AC,50/60Hz
Housing Material: Aluminum die-cast
Cooling System Advanced cooling system integrated aluminum
Work Environment Maximum Ambient Temperature: 45°C
Approvals CE compliant |

